Predicted LTV
Predicted LTV (subscription cohorts)
Dashboard → Analytics → Predicted LTV forecasts what each subscription cohort will be worth per customer after 3, 6, 12 and 24 months. A cohort is every customer whose first subscription (trial or paid) started in that month or week; months are counted from each customer’s own start. Nothing needs refreshing: it is computed when you open the page.
How it is computed
- Revenue already earned by the cohort in the first N months, with refunds deducted in the month they happened (gross of store fees).
- Plus every payment still in flight, weighted by the chance it happens: each renewing subscription’s latest price × the probability it renews that many more times before the customer’s month N. A pending trial counts at the project’s trial-to-paid rate. A subscription with auto-renew off adds nothing more.
- Renewal probabilities come from a shifted-beta-geometric curve (Fader & Hardie, “How to Project Customer Retention”, 2007) fitted to all of the project’s renewals, one curve per billing duration. Each subscriber has their own churn rate; the curve captures that the churn-prone leave first, so renewal rates rise with tenure. Subscriptions whose next payment is not due yet are treated as unknown, never as churned.
- Each cohort nudges its curve by how its renewals compare with the project’s, shrunk toward the project curve: a cohort with a handful of renewals keeps the project curve, a large one follows its own.
Confidence and limits
- Every forecast carries an 80% band combining uncertainty in the renewal rates and in which subscribers actually renew. On simulated data the band covers about 80% of outcomes and the point estimate is unbiased; on a 60-customer, one-month-old cohort it runs a few percent high.
- The label is high, medium or low from the band’s width, lowered when the horizon needs renewal periods no subscriber of the project has reached yet. Cohorts with fewer than 30 paying customers are always low.
- A horizon the cohort has fully lived through shows the actual figure, not a forecast.
- A horizon shows not enough data rather than a guess when a renewal due before it belongs to a billing duration with fewer than 10 resolved renewal outcomes across the project. This is decided per horizon: a yearly subscription that next renews at month 12 has a known 3- and 6-month value, since nothing more can be paid before them.
- The cards at the top are the whole range: total predicted revenue ÷ total customers over every cohort. When any cohort can’t be predicted at a horizon, that card is blank rather than an average of the rest, so every card covers the same customers and a longer horizon is never smaller than a shorter one.
- Not modeled: price changes and plan switches (the latest price repeats), one-time purchases (only what was already earned counts), and per-product or per-store differences (one curve per duration).
For comparison: RevenueCat’s Prediction Explorer predicts up to 24 months from per-product survival curves and shades small cohorts rather than giving intervals; Adapty predicts 3–24 months from revenue growth coefficients and hides cohorts under 30 paying users. BillDog uses renewal curves per duration because most projects have too few subscriptions per product to fit one curve each.
Prediction Explorer (first-seen cohorts)
The rest of this page describes the older Prediction Explorer, which forecasts first-seen cohorts from app activity. It keeps working unchanged.
Overview
The Prediction Explorer forecasts what a cohort will be worth at 30, 90 and 365 days, so you can judge acquisition spend against projected return rather than waiting a year to find out.
Open Dashboard → Analytics → Prediction Explorer and press Refresh predictions to run the model over your cohort snapshots.
How the forecast works
This is a statistical model, not an LLM. For each cohort it fits a power-law retention decay — retention(d) = a·d^b — by log-log regression, then integrates that curve against a per-day ARPU to project cumulative lifetime value.
Because LTV is the integral of a decaying curve, the results are monotonic by construction: the 30-day figure can never exceed the 90-day figure, which can never exceed the 365-day figure. If you see that ordering hold, the model is behaving correctly.
Minimum data: three daily snapshots
A cohort needs at least three accrued daily snapshots before a curve can be fitted. Until then the page shows an explicit insufficient-data state rather than a number — a two-point "curve" would be a straight line extrapolated over a year, which is worse than no answer.
This means predictions are time-gated on a new project. Snapshots accrue daily, so a project set up today cannot produce a forecast until it has run for three days. If the page reports cohorts skipped, that is the reason.
Confidence score
Every prediction carries a confidence value derived from three inputs:
- Number of snapshots — more history, more confidence (minimum 3)
- R² of the fit — how well the power-law curve actually matches the observed data
- Horizon penalty — confidence decays exponentially the further out you project
It is scored 0–100, so it is directly comparable across cohorts.
The 365-day figure is therefore always less trustworthy than the 30-day one, and the score says so. Treat a low-confidence long-horizon forecast as a directional signal, not a budget input.
The formula
Worth stating explicitly, because it explains what the number does and does not mean:
ARPU_daily = latest_arpu / max(latest_offset_days, 1)
LTV(H) = ARPU_daily · Σ_{d=1..H} clamp(a·d^b, 0, 1)Retention is clamped to [0,1] at every day, and the projection is a daily revenue rate multiplied by retention-days — dimensionally a rate × time, which is why it accumulates correctly across horizons. The current model is a deliberately simple baseline; a gradient-boosted replacement is planned.
ARPU is taken from the latest snapshot, not modelled. Only retention is forecast. If your pricing or mix changes materially, the forecast inherits the new ARPU on the next run rather than blending the old and new — so a price change makes historical forecasts non-comparable, not gradually wrong.
When it runs
- Weekly, automatically — a scheduled job processes every project, so forecasts stay current without anyone pressing anything.
- On demand — the Refresh predictions button processes just your project, after verifying you own it.
Because the automatic pass is weekly, a forecast you see may be up to a week old. Refresh manually if you have just accrued the third snapshot and want a result immediately.
Sandbox and live never blend
Cohorts are grouped and written back per (cohort_date, is_sandbox) pair, so sandbox and live snapshots are fitted separately and never combined. Test purchases cannot inflate a production forecast.
Related
- Retention & Stickiness
- Cohorts
- Revenue & Subscription Metrics — subscription cohort definitions
- Product Analytics
Was this page helpful?